Boq for excavation

Webbarbed wire on 450mm cranks, including, excavation and erection works, 1:3:6 mix mass concrete surround at 600mm deep. LM 70 4 2NO.TRANSFORMER PLINTH B Excavate pit foundations not exceeding 1.5 metres deep from reduced levels CM 106 C Return fill and ram suitable excavated material to the sides of the plinths CM 30 http://jowellcorp.com/chemical-injection/

Home construction - Easy way to control cost - BoQ - LinkedIn

WebWhat Is Bill Of Quantities (BOQ)? Bill of Quantities (bill of quantity), also known as “BOQ” or “BQ” in short, is a document prepared by a quantity surveyor, or cost consultant that … WebApr 3, 2024 · Bill of Quantities (BOQ) is a document the construction industry prepared to specify materials, labors, and their cost. It serves as … the vida well https://lagycer.com

Download Bill of Quantities Spreadsheet - Construction Civil …

Web02300 EXCAVATION NOTE: Excavation quantities are based on the assumption that rock layers are found at a depth less than 1.25 m from the natural ground level. A Mat Foundations m3 B Isolated Footings C Grade Beams 02300 FILLING D Compacted replacement granual material fill To T6 Building Summary S.R Webi Soil Excavation for raft slab (Actual volume to be determine on site) 165 M3 ii To Compact Well on Existing Subsoil (1 Ton Compact Roller) 445.5 M2 iii One layer of 150mm well … WebThe chemical reaction prevents clay soil from initiating the shrink-swell cycle, maintaining the subgrade in a more consistent state. Also, with additional compaction effort, the … the vidda foundation

BOQ - EXAMPLE OF SMALL DEVELOPMENT (ROADS & …

Category:BILL OF QUANTITIES

Tags:Boq for excavation

Boq for excavation

Bill of Quantities (BOQs) - Annex B Refurbishment of …

WebBOQ FOR CONCRETE ROOFED WATER KIOSK 2.5m x 2.5m SETTING OUT AND EARTH WORKS 1.01 General site clearance and setting out SM 12.25 1.02 Excavate oversite 200mm to remove vegetable soil and remove from site. CM 2.45 1.03 Excavate foundation trench to a depth n.e. 0.7m. CM 4.5 Sub-Total 1.1 WATER KIOSK … Web1 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (not exceeding 1.5 m in width as well as 10 sqm on plan) including disposal of …

Boq for excavation

Did you know?

WebBOQ shall be read and construed in conjunction with other Contract Documents. ... the construction and maintenance of all temporary works, the performance of all services and the fulfillment of all obligations and responsibilities herein defined. The Tenderer shall be deemed to have fully considered all the conditions, obligations, and ... WebDPM to beam and block floor construction >500mm 61.81 wide horizontal Visqueen EcoMembrane polythene DPM black 1200 gauge (300mu) BBA 2.5.4.1.1 m² 96 30 2.5.5 Excavation support 2.5.5.1 Excavation support 2.5.6 Retaining excavated material 2.5.6.1 Excavated material retention Retain excavated subsoil on site in spoil heaps 50m 3.96

WebThank you for downloading Sample Boq For House Construction. As you may know, people have search hundreds times for their favorite novels like this Sample Boq For … WebApr 6, 2024 · The best practice is to put a base price. Say, the architect puts a base price of Rs 100 per sqft for flooring. The contractor is expected to quote assuming the tile price to be Rs 100 per sqft ...

WebBILLS OF QUANTITIES (BOQ) CONSTRUCTION OF REAR SIDE BOUNDARY WALL AT SRCC DSR NO. DESCRIPTION OF ITEM/DSR SUB. NO. QTY. RATE PER AMOUNT EARTH WORK : 2.6 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm … WebThe BOQ will be provided to assist with the pricing. However, the BOQ submitted with the tender is required to be completed on the original copy uploaded on eTenders by hand and not typed-out. A copy of the BOQ will be available in excel on the 22/03/2024. Refer to the National Treasury eTender

WebThe BoQ is presented to the tenderers to allow them for easily set up a price for executing the works. With BoQ, the tenderers can easily figure out construction costs for their tender. The contractor submit their tenders against the bill …

Webi Soil Excavation for raft slab (Actual volume to be determine on site) 165 M3 ii To Compact Well on Existing Subsoil (1 Ton Compact Roller) 445.5 M2 iii One layer of 150mm well compacted hardcore 445.5 M2 iv One Layer of 50mm thk Lean Concrete G15 445.5 M2 v One Layer of 1.2mm thick Water Proof Membrane Sheet (including edge Slab) 475.5 M2 the vidalia market vidalia laWebtrees from site (including excavation of roots and backfilling and compaction of hole in layers of 150mm to 95% mod. ASSHTO ) No 2.0 2.0 2.0 2.1.7 Fell and Remove >250mm up to 600mm diameter bluegum trees from site (including excavation of roots and backfilling and compaction of hole in layers of 150mm to 95% mod. ASSHTO ) No 2.0 2.0 2.0 the viddy awardsWebBOQ AND SPECIFICATIONS FOR CIVIL, INTERIOR, FURNISHING, ELECTRICAL AND AIR-CONDITIONING WORKS OF DSH OFFICE AT FIRST FLOOR OF PANNA MAIN … the video agencyWebb Construction of Box-Drain(at 1.35km, 8.3km, 10.05km & 11.70km)) in stretches Excavation in foundation trenches or drains, not exceeding 1.5m in width or area 10 sq.m on plan, anddepth > 300 mm including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift 8 EW0106 All types of soil 156.00 Cum the vida v1 electric scooterhttp://www.constructioncivilengineering.com/data-of-bill-of-quantities.html the video alexiaWebBill of Quantity for the construction of four units of five classrooms prefabricated building ... internal electrical distribution network and lights, air conditioner as indicated in BOQ … the video boab oyedivuthWebJul 4, 2024 · Bill of Quantities also referred to as BOQ, is a document formulated in the construction industry to specify materials, labors, and their cost. It serves as a communication tool between client, consultant & the … the video bit depth is unsupported